Crestwood Reserve Bridges

Crestwood Reserve Project


Client: Devcon Civil

NSF Structures was proud to partner with Devcon Civil to deliver a key piece of infrastructure at Crestwood Reserve, improving connectivity and safety for the local community.

The project involved the fabrication and installation of a 16-metre pedestrian bridge, designed to provide a safe, accessible crossing point within the reserve.

Engineered for durability and minimal maintenance, the bridge features high-quality structural components and finishes that can withstand heavy public use and varying weather conditions. The design complements the natural setting, ensuring the structure blends seamlessly with the surrounding landscape while meeting all compliance and accessibility requirements.

This installation enhances the reserve’s network of walking paths, encouraging greater recreational use and improving access for all visitors.

Menu